Sunday, 14 October 2012

Four down .... loads more to go - Trail building

The last two Sundays have seen us make a start on improving the drainage to the many berms on the Dog and Monkey. To do a proper job, we’re cutting a channel through the wall of the berm and installing a 150mm diameter drainage pipe to carry water from the sump well away from the trail.



It’s going to take us a while but the end results will be well worth it.


Next Sunday, we'll be making a start on the seven berms or should that be swimming pools in Tackeroo.

Andrew


No comments:

Post a Comment